The document covers the following strands, sub-strands, and topics:
- Strand 1.0: Foundation of Building Construction
- Sub-strand 1.1: Introduction to Building Construction
- Functions of a building in day-to-day life.
- Historical development of buildings from caves to modern structures.
- Basic components of a building (floor, wall, roof, door, and window).
- Categorization of buildings based on their use (commercial, social, and residential).
- Sub-strand 1.2: Site Preparation
- Factors to consider when selecting a site for a given building.
- Safety measures and personal protective equipment (PPEs) in site preparation.
- Site clearing and stripping using appropriate hand tools (slasher, panga, jembe).
- Methods of leveling a site (cut, fill, cut and fill).
- Sub-strand 1.1: Introduction to Building Construction
- Strand 2.0: Related Drawing
- Sub-strand 2.1: Isometric Drawing
- Characteristics of isometric drawings.
- Drawing shaped blocks in isometric projection (Basic, Intermediate, Complex).
- Dimensioning shaped blocks drawn in isometric projection.
- Sub-strand 2.2: Computer Aided Drawing (CAD)
- Identification of types of CAD software used in building drawing.
- Setting up a CAD drawing environment on a digital device.
- Drawing plane shapes using CAD software.
- Sub-strand 2.1: Isometric Drawing
- Strand 3.0: Building Construction Processes
- Sub-strand 3.1: Concreting
- Constituent materials for concrete (cement, sand, coarse aggregates, water).
- Tools and equipment for concrete production.
- Processes of producing concrete: Batching, Mixing, Transporting, Placing, Compacting, and Curing.
- Safety precautions during concreting.
- Sub-strand 3.2: Foundations
- Functions and functional requirements of a foundation.
- Types of foundations used in building construction (strip, pad, raft).
- Interpretation of a strip foundation plan.
- Setting out a strip foundation using 3-4-5, builder's square, and trammel methods.
- Excavating trenches and laying a strip foundation.
- Sub-strand 3.1: Concreting
- Strand 1.0: Foundation of Building Construction
- File Size:39.91 KB
- Category:Schemes of Work
- Level:Grade 10
- Subject:BUILDING CONSTRUCTION
- Posted By:Caleb_Peter
Pay Ksh 90.00 Ksh 120.00 to Download PDF
Enter your details below to initiate a payment using MPESA.
🛒 Save Time! Add this item to your cart, shop more, and pay for everything at once—quick, easy, and hassle-free!
Continue Shopping