Summary
- Description:
The PDF document comprises Grade 10 Building Construction Strand 3 Building Construction Processes Notes. The MS Word version (editable) is also available upon your request.
It covers the following strands and sub-strands:
- Strand 3.0: Building Construction Processes
- Sub-strand 3.1: Concreting
- Constituent Materials of Concrete: Functions and characteristics of Cement (binder), Fine Aggregates (sand), Coarse Aggregates (ballast), and Water (activator).
- Hand Tools and Equipment for Concrete Production: Identification and use of Batch boxes, Shovels, Wheelbarrows, Poker Vibrators, and Concrete Mixers.
- The Concrete Production Cycle: Detailed steps: Batching (measuring), Mixing (blending), Transporting, Placing (pouring), Compacting (removing air), and Curing (maintaining moisture).
- Mix Ratios: Standard volume ratios for different concrete grades (e.g., 1:4:8 for Blinding, 1:3:6 for Mass Concrete, 1:2:4 for Reinforced Concrete).
- Importance of Concreting: Durability, Strength, Fire Resistance, and Versatility in construction.
- Sub-strand 3.2: Foundations
- Functions of a Foundation: Distributing loads, preventing settlement, providing a level surface, and anchoring the building.
- Types of Foundations: Detailed descriptions of Strip Foundation (for load-bearing walls), Pad Foundation (for columns), and Raft Foundation (for unstable soils). [Image of strip foundation construction details]
- Setting Out a Strip Foundation: Using the 3-4-5 Method (Pythagoras theorem) to ensure square corners.
- Preparing Trenches: Excavation procedures and safety checks for strip foundations.
- Laying the Strip Foundation: Pegging for level and thickness, pouring concrete, and curing.
- Sub-strand 3.3: Timbering
- Materials for Timbering: Use of Timber (Poling boards, Walings, Struts) and Steel trench sheets.
- Necessity of Timbering: Preventing soil collapse, protecting workers, and securing adjacent structures.
- Methods of Timbering:
- Stay Bracing: For firm soils.
- Poling Board System: For loose dry soils.
- Sheeting System: For loose wet soils.
- Safety Regulations: Inspection of trenches, wearing PPE, and safe removal of supports.
- Sub-strand 3.4: Foundation Walling
- Materials for Foundation Walls: Selection criteria for Natural Stone, Concrete Blocks, and Engineering Bricks (high compressive strength, low absorption).
- Bonding Techniques: Rules for bonding (Stretcher, Header, English, Flemish) to eliminate straight vertical joints.
- Construction Procedure: Building corners (Quoins), running the line, infilling courses, and checking for plumb/level.
- Backfilling: Returning soil to the trench and compacting it in layers.
- Sub-strand 3.5: Ground Floors
- Types of Ground Floors: Distinction between Solid Ground Floors (most common in Kenya) and Suspended Ground Floors.
- Components of a Solid Ground Floor:
- Subgrade: The natural soil base.
- Hardcore: Stone layer for drainage and stability.
- Blinding: Fine layer (sand/ash) to seal hardcore.
- Anti-termite Treatment: Chemical application.
- Damp Proof Membrane (DPM): Plastic sheet to stop rising damp.
- Reinforcement: BRC Mesh usage.
- Concrete Slab: The main structural layer.
- Screed: The final smooth finishing layer.
- Construction Procedure: Step-by-step process from compacting subgrade to curing the final screed.
- Sub-strand 3.1: Concreting
- Strand 3.0: Building Construction Processes
- Length:41 pages
- Category:Lesson Notes
- Level:Grade 10
- Subject:BUILDING CONSTRUCTION
Pay Ksh 80.00 Ksh 100.00 to Download PDF
Enter your details below to initiate a payment using MPESA.
🛒 Save Time! Add this item to your cart, shop more, and pay for everything at once—quick, easy, and hassle-free!
Continue Shopping