  • Description:

    The PDF document comprises Grade 10 Building Construction Strand 3 Building Construction Processes Notes. The MS Word version (editable) is also available upon your request.

    It covers the following strands and sub-strands:

    • Strand 3.0: Building Construction Processes
      • Sub-strand 3.1: Concreting
        • Constituent Materials of Concrete: Functions and characteristics of Cement (binder), Fine Aggregates (sand), Coarse Aggregates (ballast), and Water (activator).
        • Hand Tools and Equipment for Concrete Production: Identification and use of Batch boxes, Shovels, Wheelbarrows, Poker Vibrators, and Concrete Mixers.
        • The Concrete Production Cycle: Detailed steps: Batching (measuring), Mixing (blending), Transporting, Placing (pouring), Compacting (removing air), and Curing (maintaining moisture).
        • Mix Ratios: Standard volume ratios for different concrete grades (e.g., 1:4:8 for Blinding, 1:3:6 for Mass Concrete, 1:2:4 for Reinforced Concrete).
        • Importance of Concreting: Durability, Strength, Fire Resistance, and Versatility in construction.
      • Sub-strand 3.2: Foundations
        • Functions of a Foundation: Distributing loads, preventing settlement, providing a level surface, and anchoring the building.
        • Types of Foundations: Detailed descriptions of Strip Foundation (for load-bearing walls), Pad Foundation (for columns), and Raft Foundation (for unstable soils). [Image of strip foundation construction details]
        • Setting Out a Strip Foundation: Using the 3-4-5 Method (Pythagoras theorem) to ensure square corners.
        • Preparing Trenches: Excavation procedures and safety checks for strip foundations.
        • Laying the Strip Foundation: Pegging for level and thickness, pouring concrete, and curing.
      • Sub-strand 3.3: Timbering
        • Materials for Timbering: Use of Timber (Poling boards, Walings, Struts) and Steel trench sheets.
        • Necessity of Timbering: Preventing soil collapse, protecting workers, and securing adjacent structures.
        • Methods of Timbering:
          • Stay Bracing: For firm soils.
          • Poling Board System: For loose dry soils.
          • Sheeting System: For loose wet soils.
        • Safety Regulations: Inspection of trenches, wearing PPE, and safe removal of supports.
      • Sub-strand 3.4: Foundation Walling
        • Materials for Foundation Walls: Selection criteria for Natural Stone, Concrete Blocks, and Engineering Bricks (high compressive strength, low absorption).
        • Bonding Techniques: Rules for bonding (Stretcher, Header, English, Flemish) to eliminate straight vertical joints.
        • Construction Procedure: Building corners (Quoins), running the line, infilling courses, and checking for plumb/level.
        • Backfilling: Returning soil to the trench and compacting it in layers.
      • Sub-strand 3.5: Ground Floors
        • Types of Ground Floors: Distinction between Solid Ground Floors (most common in Kenya) and Suspended Ground Floors.
        • Components of a Solid Ground Floor:
          • Subgrade: The natural soil base.
          • Hardcore: Stone layer for drainage and stability.
          • Blinding: Fine layer (sand/ash) to seal hardcore.
          • Anti-termite Treatment: Chemical application.
          • Damp Proof Membrane (DPM): Plastic sheet to stop rising damp.
          • Reinforcement: BRC Mesh usage.
          • Concrete Slab: The main structural layer.
          • Screed: The final smooth finishing layer.
        • Construction Procedure: Step-by-step process from compacting subgrade to curing the final screed.
  • Length:
    41 pages
  • Category:
    Lesson Notes
  • Level:
    Grade 10
  • Subject:
    BUILDING CONSTRUCTION

Pay Ksh 80.00 Ksh 100.00 to Download PDF

Enter your details below to initiate a payment using MPESA.

Please fill out this field.
Looks good!
Looks good (optional field)!
Attachments can be downloaded immediately after purchase, and a copy will also be sent to your provided email.

🛒 Save Time! Add this item to your cart, shop more, and pay for everything at once—quick, easy, and hassle-free!

Continue Shopping

Access More Grade 10 BUILDING CONSTRUCTION Notes

BUILDING CONSTRUCTION
BUILDING CONSTRUCTION
BUILDING CONSTRUCTION
0